Analysis of Energy Efficiency Opportunities for a Public Transportation Maintenance Facility—A Case Study
Jordan Higgins, Aditya Ramnarayan, Roxana Family, Michael Ohadi- Energy (miscellaneous)
- Energy Engineering and Power Technology
- Renewable Energy, Sustainability and the Environment
- Electrical and Electronic Engineering
- Control and Optimization
- Engineering (miscellaneous)
- Building and Construction
A comprehensive energy audit of a light rail maintenance facility was performed to assess its energy performance and identify potential scope for improvements. The facility’s energy use intensity (EUI) for 2022 was 404 kWh/m2—more than double the benchmark EUI for maintenance facilities (151 kWh/m2) recommended by EnergyStar. Furthermore, the load factor was 0.22—significantly lower than the recommended minimum of 0.75 for an efficient building. The energy audit encompassed an in-depth evaluation of the facility’s structural and operational characteristics, comprising HVAC systems, lighting, the building envelope, and energy-intensive machinery. An energy model of the facility was developed to emulate the facility’s energy performance in 2022. Following the energy model’s validation, an analysis was conducted to identify opportunities for improving energy efficiency. Post-implementation of energy efficiency measures for the facility, the projected annual reductions are 1086 MWh of electricity, 5034 GJ of natural gas, utility savings of USD 162,402, and net GHG emissions reductions of 584 metric tons of CO2e. A subsequent 30% reduction in EUI to 283.6 kWh/m2 could be achieved with an 86% improvement in load factor, that is, increasing it from 0.22 to 0.41. This study emphasizes the need for energy audits and modeling for maintenance facilities to reduce Scope 1 and 2 emissions.